Illustrative Case: Michigan Class C Grower Funds LED Retrofit Through DTE and Consumers Rebates

This is not a real client. It is a worked example of a Class C indoor cultivator in Oakland County on DTE Electric full service that replaced 1,000 HPS fixtures with rebate-eligible LED grow lights, cut peak demand enough to review rate D11 primary service, and sat in the choice queue because the 10 percent cap was full.

By Jason Taken, Founder, Jaken Energy

Updated September 12, 2026Representative example, not a named client
How to read this case study

This is a representative example built from typical facility profiles, published utility tariffs, and public rate data, not a named client engagement. The numbers show how the math works in this state and facility type. Your own results depend on your load profile, utility territory, and market timing.

Illustrative example only

This case study describes a representative DTE Class C cultivator built from public rebate catalogs and labeled assumptions. It is not a real client, and the savings figures are modeled, not measured.

The facility and starting situation

Assume a Class C adult-use grower in Oakland County on DTE Electric full service in MISO Local Resource Zone 7 [dte-rate-book]. Class C licenses allow up to 2,000 plants; industry trackers citing CRA data reported 800 active Class C grower licenses statewide as of July 2026 [growgoyle-mi-q3-2026]. This facility runs 1,600 plants in a 45,000-square-foot building with 18,000 square feet of flowering canopy under double-ended HPS.

At energization the account took DTE Rate D4 Large General Service on secondary voltage. Distribution demand is $27.10 per kW of monthly billing demand, plus a $9.18 per kW capacity demand charge and $7.48 per kW non-capacity demand charge on full service [dte-rate-book]. Summer peak demand hit 520 kW with every flower room on the same photoperiod. Michigan averages 6,745 heating degree days and 579 cooling degree days, so winter heat rejection from lighting dominates HVAC load [noaa-cag-michigan].

The operator entered DTE's electric choice queue at service application. The MPSC reported the choice program fully subscribed in 2025 with 5,517 customers on choice and 5,101 waiting [mpsc-choice-2025-report]. Consumers Energy's September 2026 cap tracker showed only 42,004 MWh of allotments open against 5.3 million MWh of queued load [consumers-electric-choice]. Supplier shopping was a long-term option, not a near-term bill fix.

What the baseline bills showed

The table mixes cited DTE tariff rates with assumed usage. Only the rates are facts; kWh, kW, and totals are inputs.

Line itemAssumption or rateMonthly (winter)Monthly (summer)Notes
Flower HPS380 kW on 12 h/day138,700 kWh138,700 kWhAssumed load
Veg and mother55 kW on 18 h/day30,100 kWh30,100 kWhAssumed load
HVAC and dehumid140 kW winter / 165 kW summer avg100,800 kWh118,800 kWhAssumed load
Measured peak demand520 kW / 490 kW520 kW490 kWD4 billing demand
Distribution demand (D4)$27.10 per kW [dte-rate-book]$14,092$13,279Delivery
Capacity demand (D4)$9.18 per kW [dte-rate-book]$4,774$4,498Full service
Non-capacity demand (D4)$7.48 per kW [dte-rate-book]$3,890$3,665Full service
Energy + ridersAssume 7.1 cents per kWh~$19,200~$20,400Modeled supply
Approximate total~$56,000~$58,000Excludes taxes

Annualized demand charges on D4 alone were about $300,000: twelve months averaging $25,000 in per-kW lines. At the EIA June 2026 Michigan commercial average of 16.63 cents per kWh on roughly 3.4 million kWh, all-in spend would land near $565,000 [eia-epm-5-6-a]. The operator had capital for expansion but not for a primary-voltage transformer until rebates changed the math.

What changed

Three projects ran from February through July 2026.

Room-by-room LED retrofit with DTE reservations. The operator reserved DTE measure AG-30/31 LED grow lights before purchase [dte-ee-catalog-2026]. Fixtures had to meet at least 2.10 micromoles per joule photosynthetic photon efficacy. With 6,500 operating hours per year in flower, the project qualified for Tier 2 rebates in the catalog [dte-ee-catalog-2026]. AG-35 HVAC-reduction rebates applied where documented watt reduction lowered grow-room cooling load; the catalog states year-round indoor cannabis grow rooms are eligible [dte-ee-catalog-2026]. Custom rebates cap at 75 percent of implementation cost [dte-ee-catalog-2026].

Staggered photoperiods. Four flower rooms moved to two start times, cutting coincident lighting step from 380 kW to 310 kW in the model. See peak demand vs. peak usage for why interval shape matters on DTE's on-peak billing-demand ratchet [dte-rate-book].

Primary-voltage feasibility study. After LED and stagger work, peak demand modeled at 395 kW. An engineer priced a pad-mounted transformer for Rate D11 Primary Supply, which bills distribution at $7.15 per kW at primary voltage under 24 kV versus $27.10 on D4 secondary [dte-rate-book]. D11 requires a 50 kW minimum contract capacity [dte-rate-book]. The operator deferred transformer purchase until rebate cash landed.

A sister facility on Consumers Energy in Grand Rapids ran the parallel AG211 agricultural LED measure with pre-notification [consumers-ee-business]. That site is outside this bill model but shared procurement specs.

The math after

Assume LED and stagger cut peak demand from 520 kW to 395 kW on D4 through the first year, then D11 primary service in year two after transformer install.

Line itemBefore (month, D4)After year 1 (D4)After year 2 (D11)Notes
Peak demand520 kW395 kW395 kWModeled
Distribution demand $/kW$27.10$27.10$7.15[dte-rate-book]
Distribution demand charge$14,092$10,705$2,824
Capacity + non-capacity demand$8,664$6,579Modeled similarD11 differs on choice
Annual kWh3.4M2.85M2.85MLED savings
DTE rebates (one-time)$0~$210,000Assumed reservation
Modeled annual all-in~$672,000~$520,000~$455,000

Simple payback on $680,000 LED capital minus $210,000 rebates: year-one savings of roughly $152,000 imply about 3.1 years on energy alone, before D11 primary savings in year two. Transformer capital of $180,000 in the model adds payback time but cuts monthly demand by another ~$7,500 on the distribution line alone [dte-rate-book].

At the EIA Michigan industrial average of 9.24 cents per kWh, the same kWh would look cheaper on paper [eia-epm-5-6-a], but DTE still bills demand on D4 until rate class changes [dte-rate-book].

What did not work

Buying LEDs before DTE reservation. The first 200 fixtures purchased without pre-approval were ineligible for AG-30/31 rebates [dte-ee-catalog-2026]. The operator reordered after reservation numbers issued.

Waiting for choice to open. Queue position did not move in 18 months [mpsc-choice-2025-report]. Supply quotes at 6.4 cents per kWh could not beat tariff plus demand work while still on full service.

Night-only photoperiod for demand shaving. DTE bills monthly billing demand on the highest interval in the month, not a time-of-use split on D4 [dte-rate-book]. Staffing cost ended the experiment after one cycle.

Undersized dehumidification after LED. Lower sensible heat raised relative humidity. Two rooms needed AG-listed dehumidifier upgrades in the custom track [dte-ee-catalog-2026].

Michigan choice cap and efficiency timing

Michigan caps competitive supply at ten percent of utility load with a waiting queue [mi-mpsc-choice-2025]. Efficiency rebates through DTE or Consumers programs proceed independently of choice enrollment. Sequence rebate pre-approval before fixture purchase even if supply stays on default while queued.

DTE and Consumers efficiency programs parallel to choice queue

Michigan choice cap limits supplier options but not utility efficiency rebates. DTE and Consumers business programs may fund horticultural LED measures under prescriptive rules while the account waits in the choice queue [mi-mpsc-choice-2025]. Pre-approval before purchase remains mandatory.

Queue status check quarterly

MPSC publishes choice program status reports [mi-mpsc-choice-2025]. If queue position does not move, default supply remains the supply-side baseline while rebates still reduce kWh. Do not delay LED projects waiting for cap space unless supplier savings exceed rebate plus kWh savings combined.

Default supply while queued: still shop efficiency

Choice queue does not block DTE or Consumers rebate applications. LED savings accrue on default supply rates until supplier enrollment clears [mi-mpsc-choice-2025].

Choice queue and supplier RFP timing

Run supplier RFP when cap space opens or when MPSC reports attrition, not only at initial energization. LED retrofit savings accrue on default supply while waiting [mi-mpsc-choice-2025]. Document queue position in board materials so supply savings are not assumed in year-one pro forma.

Efficiency first while queued for choice

DTE and Consumers efficiency programs accept applications while accounts wait in the Michigan choice queue [mi-mpsc-choice-2025]. LED savings reduce kWh on default supply immediately; supplier savings wait on cap space.

DTE versus Consumers rebate portals

Michigan utilities run separate business efficiency portals. Fixture pre-approval must match the serving utility territory even when the operator holds licenses statewide [mi-mpsc-choice-2025].

Queue check before supplier LOI

Verify MPSC queue status before signing supplier letter of intent; cap space may not open before LOI expiration [mi-mpsc-choice-2025].

Queue check before supplier LOI

Verify MPSC queue status before signing supplier letter of intent; cap space may not open before LOI expiration [mi-mpsc-choice-2025].

Lessons that transfer to other Michigan cultivators

Reserve DTE AG-30/31 or Consumers AG211 before you buy fixtures [dte-ee-catalog-2026] [consumers-ee-business]. Treat choice as a queue: optimize tariff and load on full service first [mpsc-choice-2025-report]. Compare D4 secondary to D11 primary when peak demand exceeds a few hundred kW [dte-rate-book]. Stagger flower rooms before capital upgrades; scheduling is free. Read the Michigan cultivation energy page and the FAQ on lowering grow bills.

Frequently asked questions

Is this a real Michigan cultivator engagement?

No. The facility, owner, and dollar outcomes are illustrative. DTE rebate measures, rate schedule figures, and cap status cited come from public utility and MPSC sources.

Do DTE rebates apply to cannabis grow rooms specifically?

DTE's 2026 business catalog lists indoor-agriculture measures including LED grow lights at 2.10 micromoles per joule PPE or better and an HVAC-reduction measure that explicitly applies to year-round indoor cannabis grow rooms. Pre-approval is required before purchase.

Why stay on DTE full service instead of switching supplier?

Michigan's 10 percent choice cap is binding on DTE and Consumers. In 2025, 5,517 customers were on choice with 5,101 more in the queue. A new grow should assume utility full service and optimize tariff and load while waiting.

When does primary-voltage D11 beat secondary D4?

DTE Rate D4 carries a $27.10 per kW distribution demand charge on secondary service, while Rate D11 at primary voltage bills $7.15 per kW at under 24 kV. The trade-off is owning the transformer and, on choice, arranging capacity.

About the author
Jaken Energy

Jason Taken founded Jaken Energy, the commercial energy procurement practice behind this site. He works with licensed cannabis operators in deregulated electricity markets to lower supply rates, manage demand charges, and evaluate efficiency upgrades.

Sources

Inline citations in this article, such as [eia-epm-5-6-a], refer to the entries below. Links open the primary source in a new tab.

  1. [eia-epm-5-6-a]Electric Power Monthly, Table 5.6.A: Average Price of Electricity to Ultimate Customers by End-Use Sector, by State, June 2026 and June 2025U.S. Energy Information Administration. Accessed 2026-09-11.
  2. [dte-ee-catalog-2026]2026 Program Rebate Catalog, Energy Efficiency Program for Business (Indoor agricultural specifications)DTE Energy. Accessed 2026-09-11.
  3. [consumers-ee-business]Business Energy Efficiency Programs and Incentive Catalog (Agricultural LED Grow Lighting AG211)Consumers Energy. Accessed 2026-09-11.
  4. [dte-rate-book]DTE Electric Company Rate Book for Electric Service, M.P.S.C. No. 1 - Electric (rate schedules D3, D4, D11)DTE Electric. Accessed 2026-09-11.
  5. [mpsc-choice-2025-report]State's electric choice program remains fully subscribed in 2025 (annual Status of Electric Competition report), February 2, 2026Michigan Public Service Commission. Accessed 2026-09-11.
  6. [consumers-electric-choice]Electric Customer Choice for Business (ROA 10% Cap Tracking System report)Consumers Energy. Accessed 2026-09-11.
  7. [noaa-cag-michigan]Climate at a Glance: Michigan statewide heating and cooling degree days, 1991-2020 base period averagesNOAA National Centers for Environmental Information. Accessed 2026-09-11.
  8. [growgoyle-mi-q3-2026]Michigan Cannabis Market Q3 2026: Prices and Licenses (citing CRA active-license data, snapshots May 31 and July 23, 2026)Grow Goyle. Accessed 2026-09-11.