PPL Electric for Cannabis Facilities: GS-1 Through LP-5, Demand Charges, and EGS Supply
PPL Electric Utilities delivers power across 29 counties of central and eastern Pennsylvania inside PJM, including Allentown, Harrisburg, Lancaster, Scranton, and Wilkes-Barre. Rate Schedule GS-1 covers small general service with no demand charge, GS-3 bills per-kW distribution on measured demand, and LP-4 and LP-5 cover large power at primary and transmission voltage. Small C and I default is a fixed Price to Compare reset semiannually; large C and I default is hourly priced, which pushes most grower/processors toward a fixed EGS contract.
Service area and grid operator
PPL Electric Utilities is the second-largest Pennsylvania electric distribution company and serves 29 counties of central and eastern Pennsylvania, including Allentown, Harrisburg, Lancaster, Scranton, and Wilkes-Barre [pa-papowerswitch]. The territory is entirely in PJM [pa-puc-retail-markets]. Several grower/processor facilities among the 25 permits capped under Act 16 sit in Lancaster, Lebanon, and the Lehigh Valley within PPL territory [pa-papowerswitch].
Central Pennsylvania's climate runs heating-heavy: 5,701 statewide heating degree days against 706 cooling degree days [noaa-cag-pennsylvania]. A grower/processor here spends much of the year managing envelope heat loss, then faces a concentrated summer dehumidification season that often sets both billing demand and PLC tags [noaa-cag-pennsylvania].
Rate schedules and class placement
PPL's retail tariff uses these principal commercial schedules [pa-papowerswitch]:
| Schedule | Description | Demand charge? | Typical cannabis account |
|---|---|---|---|
| GS-1 | Small general service | No [pa-papowerswitch] | Dispensary, small office |
| GS-3 | General service with demand, secondary or primary voltage | Per-kW on measured demand [pa-papowerswitch] | Grower/processor, larger retail |
| LP-4 | Large power, primary voltage | Per-kW [pa-papowerswitch] | Large grower/processor on primary |
| LP-5 | Large power, transmission voltage | Per-kW [pa-papowerswitch] | Uncommon in cannabis |
Confirm the current per-kW figures on PPL's tariff before quoting a facility [pa-papowerswitch]. The structure is stable even when dollar rates change on filing: GS-1 bills energy only, GS-3 and LP schedules add a monthly demand line keyed to measured peak kW.
A grower/processor with 350 kW of lighting and 150 kW of summer HVAC peaks at 500 kW on one meter and sits on GS-3 or approaches LP-4 depending on voltage and contract demand. A dispensary in downtown Lancaster using 8,000 kWh a month with peak demand under the GS-1 threshold stays on energy-only billing [pa-papowerswitch].
Demand charge structure
GS-3 carries a per-kW distribution charge on measured demand [pa-papowerswitch]. Unlike PECO's billing-demand floor for contract demand above 500 kW, PPL's GS-3 line follows measured peak unless a ratchet applies on the current tariff sheet [pa-papowerswitch]. Pull interval data and identify the half-hour that set each month's peak before blaming the lighting schedule alone.
For an assumed 480 kW measured demand, multiply by the tariff per-kW rate to estimate the monthly demand line. Add customer charges, metering, and energy delivery per kWh. That total is the delivery bill no EGS can reduce. The demand charges page and interval data page cover management tactics.
Default supply and Price to Compare
Default service for small C and I is a fixed Price to Compare reset semiannually [pa-papowerswitch]. The PTC is generation plus transmission for each class, published for benchmarking on PAPowerSwitch [pa-puc-retail-markets]. Dispensaries on GS-1 compare EGS offers directly against that semiannual figure.
Large C and I default service is hourly priced off PJM [pa-papowerswitch] [pa-puc-retail-markets]. Grower/processors on GS-3 or LP schedules that stay on default ride hourly wholesale volatility through every batch cycle and every summer dehumidification peak. Fixed EGS contracts are the standard fix, with attention to whether PJM capacity is bundled or passed through on the PLC tag [pa-puc-retail-markets].
Act 129 requires default service to be a prudent mix of spot, short-term, and long-term supply [pa-puc-electricity], which governs how PPL constructs the semiannual PTC even when large accounts never see a fixed number [pa-puc-electricity].
Metering and PLC tags
PPL sets peak load contribution and network service peak load tags that drive capacity pass-through for EGS customers [pa-puc-retail-markets]. Tags follow summer coincident peak behavior on the meter. A grow that lowers its July peak through dehumidification sequencing or lighting stagger reduces next year's capacity line on both default and EGS bills [pa-puc-retail-markets].
Request twelve months of interval data before signing an EGS contract on a GS-3 or LP account. Suppliers price blind without it, and blind pricing includes margin for uncertainty you pay for.
Efficiency programs
PPL Electric's Act 129 business program offers performance-based rebates for lighting, HVAC, refrigeration, VFDs, controls, CHP, and agricultural equipment, plus direct-discount offers for small businesses [ppl-biz-savings]. Phase IV ran June 2021 through May 2026; Phase V began June 1, 2026 [ppl-biz-savings]. Confirm the Phase V measure list before ordering fixtures, because Phase IV did not name a DLC horticultural lighting measure and Phase V schedules were not fully verified for that item at the time this page was written [ppl-biz-savings].
Custom incentives for dehumidification and chiller upgrades often pay better than prescriptive lighting rebates in PPL territory given the humid summer latent load [noaa-cag-pennsylvania].
How an EGS contract works with PPL billing
A PUC-licensed EGS replaces PPL's default generation and transmission charges [pa-puc-retail-markets]. PPL continues to deliver power and bill regulated delivery lines [pa-puc-retail-markets]. Consolidated billing keeps one familiar bill format; dual billing splits delivery and supply [pa-papowerswitch].
The EGS submits enrollment, and the switch takes effect at the next meter read [pa-papowerswitch]. Calendar contract end dates against semiannual PTC resets so you re-bid before lapse to hourly default on the grow meter [pa-puc-retail-markets]. The Pennsylvania switching guide covers enrollment step by step. The PPL grower/processor case study walks through a central Pennsylvania example, and the Pennsylvania rate page compares PPL classes alongside PECO and Duquesne.
Comparing PPL to PECO on the same portfolio
Operators sometimes hold a grower/processor on PPL in Lancaster County and dispensaries on PECO in Montgomery County. Both territories use PJM capacity tags [pa-puc-retail-markets], but PPL GS-3 bills measured demand while PECO GS applies a billing-demand floor once contract demand exceeds 500 kW [pa-papowerswitch] [peco-rates-tariffs]. Default supply resets differ too: PPL small C and I PTC resets semiannually [pa-papowerswitch], while PECO Generation Supply Adjustment resets June 1 and December 1 [peco-rates-tariffs]. One EGS can serve both meters, but the quote should treat each delivery class separately rather than averaging the two bills.
GS-1 to GS-3 migration in central PA
PPL Rate GS-1 serves small general service without demand charges; GS-3 bills per-kW distribution on measured demand [pa-papowerswitch]. Harrisburg and Scranton corridor grows crossing the GS-3 threshold need interval metering and an EGS contract because large C and I default is hourly priced [pa-papowerswitch]. Confirm Phase V measure lists on PPL's business program before ordering horticultural fixtures [ppl-biz-savings].
Quarterly bill review cadence
Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports where available, supplier contracts, and witness test reports [pa-papowerswitch]. Update the folder after every rate case order and every benchmark reset published by the regulator [pa-puc-retail-markets]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies before paying disputed invoices [ppl-biz-savings]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites [noaa-cag-pennsylvania]. Legal should keep meter assignment language in leases aligned with the license holder on the utility account [pa-puc-electricity]. Confirm current rules with the regulator or your advisor before signing supply contracts [pa-papowerswitch].
Documentation for audits and lenders
Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports where available, supplier contracts, and witness test reports [pa-papowerswitch]. Update the folder after every rate case order and every benchmark reset published by the regulator [pa-puc-retail-markets]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies before paying disputed invoices [ppl-biz-savings]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites [noaa-cag-pennsylvania]. Legal should keep meter assignment language in leases aligned with the license holder on the utility account [pa-puc-electricity]. Confirm current rules with the regulator or your advisor before signing supply contracts [pa-papowerswitch].
Board reporting on utility COGS
Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports where available, supplier contracts, and witness test reports [pa-papowerswitch]. Update the folder after every rate case order and every benchmark reset published by the regulator [pa-puc-retail-markets]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies before paying disputed invoices [ppl-biz-savings]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites [noaa-cag-pennsylvania]. Legal should keep meter assignment language in leases aligned with the license holder on the utility account [pa-puc-electricity]. Confirm current rules with the regulator or your advisor before signing supply contracts [pa-papowerswitch].
Tariff verification before budgeting
Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports where available, supplier contracts, and witness test reports [pa-papowerswitch]. Update the folder after every rate case order and every benchmark reset published by the regulator [pa-puc-retail-markets]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies before paying disputed invoices [ppl-biz-savings]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites [noaa-cag-pennsylvania]. Legal should keep meter assignment language in leases aligned with the license holder on the utility account [pa-puc-electricity]. Confirm current rules with the regulator or your advisor before signing supply contracts [pa-papowerswitch].
LP-4 primary for large central PA grows
PPL LP-4 and LP-5 serve large power at primary and transmission voltage [pa-papowerswitch]. Grower/processors above GS-3 thresholds should evaluate primary service during initial design [pa-papowerswitch].
Frequently asked questions
What territory does PPL Electric serve?
PPL Electric serves 29 counties of central and eastern Pennsylvania, including Allentown, Harrisburg, Lancaster, Scranton, and Wilkes-Barre. It is the second-largest Pennsylvania EDC and sits entirely in PJM.
What is the difference between GS-1 and GS-3 at PPL?
GS-1 is small general service with no demand charge. GS-3 is general service with demand at secondary or primary voltage and carries a per-kW distribution charge on measured demand. A grower/processor that peaks above the GS-1 threshold moves to GS-3 and picks up demand billing.
Does PPL publish a fixed default price for large accounts?
Small C and I default is a fixed Price to Compare reset semiannually. Large C and I default service is hourly priced off PJM. A grower/processor above the threshold that wants budget certainty on supply signs with a PUC-licensed EGS.
When does a PPL account move to LP-4 or LP-5?
LP-4 and LP-5 cover large power at primary and transmission voltage. A full-buildout grower/processor with several hundred kW of demand and primary service may land on LP-4. Confirm placement with the rate schedule on PPL's tariff page and on your bill.
Are there PPL rebates for grow facilities?
PPL's Act 129 business program offers performance-based rebates for lighting, HVAC, refrigeration, VFDs, controls, CHP, and agricultural equipment. Phase IV ended May 2026; confirm Phase V measure lists and whether horticultural lighting appears before designing a retrofit around a rebate.
Can I get one bill from PPL with an EGS supply charge?
Yes. Consolidated billing is the usual arrangement. The EGS supply charge replaces PPL default generation and transmission on the same bill while delivery charges stay with PPL.
Related reading
- Pennsylvania Cannabis Energy: Electricity Choice, Rates, and Utilities for Licensed Operators
How PA medical cannabis grower/processors and dispensaries buy power: PECO, PPL, and Duquesne choice, PJM rates, Act 129, and the 25-permit cap.
- PECO for Cannabis Facilities: Delivery Classes, Demand Charges, Default Supply, and EGS Billing
How PECO bills a cannabis grow, lab, or dispensary: Rate GS through HT, per-kW distribution demand, PJM, Generation Supply Adjustment, and consolidated billing.
- Pennsylvania Commercial Electricity Rates for Cannabis Facilities: EDC Classes, Benchmarks, and Bill Drivers
Pennsylvania commercial power prices vs. the U.S., PECO PPL and Duquesne delivery classes, Price to Compare benchmarks, and PJM capacity context.
- How to Switch Electricity Suppliers in Pennsylvania: A Step-by-Step Guide for Cannabis Businesses
How a PECO, PPL, or Duquesne business enrolls with a PUC-licensed EGS: eligibility, Price to Compare, enrollment, meter-read timing, and contract rules.
- Pennsylvania Cannabis Cultivation Facility Energy: Lighting, HVAC, and Demand Charges Under PECO and PPL
What a PA grower/processor pays for power: lighting and dehumidification in a 5,701 HDD climate, PECO and PPL demand classes, and a worked example.
- Demand Charges Explained for Cannabis Cultivators
What a demand charge is, how utilities measure peak kW in 15- or 30-minute windows, why grow rooms get hit hard, how ratchets work, and a worked example.
- Interval Data & AMI Meters: Using Your Data to Negotiate Better Rates
How to pull 15-minute interval data via Green Button, read your load shape, see how suppliers price load factor, and know what to send a broker.
- Illustrative Case: PPL Grower-Processor Moves Off Hourly Default Before Flower Expansion
Illustrative PPL grower-processor example: hourly default service, PJM capacity tags, and staggered rooms before a fixed EGS contract in central PA.
Jason Taken founded Jaken Energy, the commercial energy procurement practice behind this site. He works with licensed cannabis operators in deregulated electricity markets to lower supply rates, manage demand charges, and evaluate efficiency upgrades.
Sources
Inline citations in this article, such as [pa-papowerswitch], refer to the entries below. Links open the primary source in a new tab.
- [pa-papowerswitch]PAPowerSwitch: The Official Electric Shopping Website of the Pennsylvania Public Utility Commission (including Shop for Business) — Pennsylvania Public Utility Commission. Accessed 2026-09-11.
- [pa-puc-retail-markets]Retail Markets — Pennsylvania Public Utility Commission. Accessed 2026-09-11.
- [ppl-biz-savings]PPL Business Energy Efficiency Program — PPL Electric Utilities. Accessed 2026-09-11.
- [noaa-cag-pennsylvania]Climate at a Glance: Pennsylvania statewide heating and cooling degree days, 1991-2020 base period averages — NOAA National Centers for Environmental Information. Accessed 2026-09-11.
- [pa-puc-electricity]Electricity — Pennsylvania Public Utility Commission. Accessed 2026-09-11.
- [peco-rates-tariffs]PECO Rates and Tariffs (Electric Service Tariff No. 8, effective April 1, 2026) — PECO. Accessed 2026-09-11.