Skip to content

Michigan Commercial Electricity Rates for Cannabis Facilities: DTE and Consumers Demand Classes

Michigan commercial electricity averaged 16.63 cents per kWh in June 2026, about 17 percent above the U.S. average of 14.19 cents, while industrial customers averaged 9.24 cents. DTE and Consumers bill their larger classes heavily on peak kW, and the 10 percent choice cap means most cannabis facilities pay utility full-service tariffs rather than competitive supply.

By Jason Taken, Founder, Jaken Energy

Updated September 11, 2026Last verified: September 11, 2026
Avg. commercial price
16.63 cents/kWh
June 2026
U.S. average
14.19 cents/kWh
June 2026
Energy choice
Electric Customer Choice (Retail Open Access) under PA 141 of 2000, as capped by PA 286 of 2008 and amended by PA 341 of 2016
All retail customers of the rate-regulated utilities (DTE Electric, Consumers Energy, Indiana Michigan Power, Upper Peninsula Power, Upper Michigan Energy Resources, Cloverland Electric) may apply, but participation is limited to 10% of each utility's prior-year weather-adjusted sales; in practice nearly all participants are commercial and industrial accounts. Municipal utilities and most cooperatives are not open.
Cooling / heating degree days
579 / 6745
Annual normals; see climate source

Michigan figures last verified 2026-09-11. Full citations in the Sources section.

Michigan vs. the U.S. average

SectorMichigan, June 2026U.S. average, June 2026Michigan vs. U.S.
Commercial16.63 cents/kWh14.19 cents/kWh+2.44 cents, about 17 percent higher
Industrial9.24 cents/kWhnot in state file

Source: EIA Electric Power Monthly, Table 5.6.A [eia-epm-5-6-a].

Average commercial electricity price by state, June 2026. Source: EIA Electric Power Monthly, Table 5.6.A. See each state page for the specific citation and verification date.
StateAvg. commercial priceCannabis marketEnergy choice
California27.33 cents/kWhAdult-use + medicalCommercial-only choice
Massachusetts24.52 cents/kWhAdult-use + medicalFull commercial choice
New York23.56 cents/kWhAdult-use + medicalFull commercial choice
Washington, D.C.23.38 cents/kWhMedical onlyFull commercial choice
Rhode Island22.70 cents/kWhAdult-use + medicalFull commercial choice
Maine22.24 cents/kWhAdult-use + medicalFull commercial choice
New Hampshire21.22 cents/kWhMedical onlyFull commercial choice
Connecticut19.62 cents/kWhAdult-use + medicalFull commercial choice
New Jersey18.47 cents/kWhAdult-use + medicalFull commercial choice
Maryland16.84 cents/kWhAdult-use + medicalFull commercial choice
Michigan16.63 cents/kWhAdult-use + medicalCapped commercial choice
Illinois14.53 cents/kWhAdult-use + medicalFull commercial choice
Delaware14.40 cents/kWhAdult-use + medicalFull commercial choice
Ohio13.77 cents/kWhAdult-use + medicalFull commercial choice
Pennsylvania13.33 cents/kWhMedical onlyFull commercial choice
Nevada9.83 cents/kWhAdult-use + medicalCommercial-only choice
Texas8.66 cents/kWhLow-THC medical onlyFull commercial choice

DTE Electric delivery classes

RateDescriptionDemand billing (full service)
D3General Service, energy-only secondary, up to 1,000 kW [dte-rate-book]No demand charge; 6.670 cents/kWh distribution energy
D4Large General Service, demand-metered secondary [dte-rate-book]27.10 dollars/kW distribution; 9.18 dollars/kW capacity; 7.48 dollars/kW non-capacity [dte-rate-book]
D11Primary Supply, 50 kW minimum [dte-rate-book]7.15 dollars/kW distribution at primary under 24 kV [dte-rate-book]

D4 includes an on-peak billing-demand ratchet [dte-rate-book]. Figures are from rate book sheets issued through February 19, 2026 orders; confirm against current filings [dte-rate-book].

Consumers Energy delivery classes

RateDescriptionTypical cannabis account
GSGeneral Service, energy-based [consumers-large-business-rates]Dispensaries
GSDGeneral Service Secondary Demand [consumers-large-business-rates]Mid-sized grows, processors
GP / GPD / GPTUPrimary and time-of-use [consumers-large-business-rates]Large grows, high load factor

GSD, GPD, and GPTU bill capacity and distribution per kW of on-peak or maximum demand [consumers-large-business-rates]. Confirm current per-kW figures on MPSC No. 14 rate book sheets.

Choice cap and effective rates

Both DTE and Consumers have been at the 10 percent cap since roughly 2010 [mpsc-choice-2025-report]. Most cannabis facilities pay full-service tariff rates, not AES supply. The effective rate is the utility schedule plus surcharges, not a market-priced contract.

In 2025, 5,517 customers totaling 2,172 MW were on choice; 5,101 waited in queue [mpsc-choice-2025-report].

MISO Zone 7 capacity context

DTE and Consumers sit in MISO Local Resource Zone 7 [mpsc-choice-2025-report]. MISO moved to seasonal capacity auctions [mpsc-choice-2025-report]. DTE separately bills capacity demand on D4 full service at 9.18 dollars/kW [dte-rate-book]. Choice customers must arrange capacity or buy utility capacity service [mpsc-choice-2025-report].

Seasonality and climate

Michigan averages 6,745 heating degree days and 579 cooling degree days [noaa-cag-michigan]. Cultivators see high winter kWh and summer kW peaks from dehumidification. Dispensaries see winter HVAC kWh on D3 or GS.

How to read a Michigan commercial bill

  1. Customer charge: fixed monthly
  2. Distribution energy: cents per kWh
  3. Distribution demand: dollars per kW (D4, GSD, GPD)
  4. Capacity demand: dollars per kW (D4 full service)
  5. Power supply cost recovery: fuel and generation adjustment on full service
  6. Energy optimization surcharge: efficiency program funding
  7. Taxes

On full service, generation and capacity are bundled into utility charges. On choice service, AES supply replaces the generation component but delivery demand lines remain.

Worked comparison: same load on DTE D4 vs D11

Assume a 350 kW billing demand, 250,000 kWh monthly use, DTE full service, using rate book figures [dte-rate-book]:

Line itemD4 secondaryD11 primary under 24 kV
Distribution demand350 x $27.10 = $9,485350 x $7.15 = $2,503
Capacity demand (D4 full)350 x $9.18 = $3,213Utility or self-arranged on choice
Non-capacity demand (D4 full)350 x $7.48 = $2,618N/A on D11 full-service path
Energy at 16.63 cents/kWh avg$41,575 [eia-epm-5-6-a]$41,575 [eia-epm-5-6-a]

Demand-side savings on D11 in this illustration exceed $12,000 per month before other components. Primary infrastructure capex must be weighed against that delta over a 10-year horizon. Confirm all figures against the current rate book and any 2026 MPSC order [dte-rate-book].

Consumers GSD vs GPD selection logic

Rate GSD suits secondary-voltage grows with moderate load factor [consumers-large-business-rates]. Rate GPD targets primary-voltage customers with high load factor who can run equipment at higher voltage [consumers-large-business-rates]. GPTU adds time-of-use pricing for operations that can shift non-critical load off on-peak periods [consumers-large-business-rates]. A processor running weekday batches might evaluate GPTU if weekend load is minimal.

Why Michigan averages exceed Ohio

Ohio commercial averaged 13.77 cents/kWh and Michigan 16.63 cents/kWh in June 2026 [eia-epm-5-6-a]. The 2.86 cent gap reflects higher regulated delivery demand charges, full-service supply bundling, and limited competitive pressure while the cap is full [mpsc-choice-2025-report]. Ohio cultivators on CRES contracts can shop supply immediately [oh-energychoice-glossary]; Michigan cultivators optimize tariff first.

Indiana Michigan Power and Upper Peninsula notes

Southwest Michigan cannabis facilities on Indiana Michigan Power sit in PJM with the same 10 percent cap mechanics [mpsc-choice-2025-report]. Upper Peninsula utilities are small territories with limited cannabis presence but identical cap rules [mpsc-choice-2025-report]. Multi-state operators should not assume Lower Peninsula rate structures apply in the UP.

Tracking MPSC rate cases

Both DTE and Consumers file periodic rate cases that update per-kW figures on D4, D11, GSD, and GPD [dte-rate-book] [consumers-large-business-rates]. Cannabis facilities with long-term pro formas should note the docket number on their current bill and monitor MPSC orders. A rate case can move delivery charges independently of MISO energy markets. Confirm class placement whenever MPSC orders revise sheet D-24.00 or D-51.00 figures [dte-rate-book] [consumers-large-business-rates].

DTE demand charge summary on full service

RateDemand charge typeIllustrative figure (verify in rate book)
D3None (energy-only)6.670 cents/kWh distribution energy [dte-rate-book]
D4Distribution + capacity + non-capacity per kW$27.10/kW distribution on billing demand [dte-rate-book]
D11Primary distribution per kW$7.15/kW under 24 kV [dte-rate-book]

Figures change with each MPSC order [dte-rate-book]. Confirm against the current DTE Electric Rate Book before quoting.

Consumers GSD/GPD structure

GSD, GPD, and GPTU bill capacity and distribution per kW of on-peak or maximum demand [consumers-large-business-rates]. Large Economic Development rate requires 35,000 kW commitment, far above cannabis scale [consumers-large-business-rates]. Class C grows evaluate GSD vs primary GPD/GPTU [consumers-large-business-rates].

Reading a Michigan full-service bill

Full-service bills bundle generation into power supply cost recovery and energy optimization surcharges [consumers-large-business-rates]. Demand lines on GSD or D4 appear separately [dte-rate-book]. Normalizing cents per kWh requires dividing total bill by total kWh, not using commercial average alone [eia-epm-5-6-a].

Seasonality table

SeasonLoad driverRate impact
WinterHeating, make-up air, dehumidificationHigh kWh [noaa-cag-michigan]
SummerDehumidification, modest coolingHigh kW on D4/GSD [noaa-cag-michigan]
ShoulderMaintenance, batch schedulingOpportunity to cut peaks [dte-rate-book]

Cap tracker links

Monitor DTE and Consumers cap tracking systems weekly when near queue top [dte-electric-choice] [consumers-electric-choice]. Attrition frees allotments unpredictably [mpsc-choice-2025-report]. Cannabis load rarely exits choice voluntarily [mpsc-choice-2025-report].

Rate book verification discipline

DTE D4 and D11 figures from MPSC orders [dte-rate-book]. Consumers GSD sheet D-51.00 [consumers-large-business-rates]. Cap administration Case U-15801 [mpsc-cap-data]. MISO Zone 7 capacity on choice [mpsc-choice-2025-report].

Commercial 16.63, industrial 9.24 cents/kWh June 2026 [eia-epm-5-6-a]. Winter kWh high, summer kW high pattern [noaa-cag-michigan]. Monitor DTE and Consumers cap trackers [dte-electric-choice] [consumers-electric-choice].

Use cap data page for official U-15801 procedures [mpsc-cap-data].

Compliance and documentation practices

Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports, queue confirmation letters where applicable, CRES contracts, and witness test reports [eia-epm-5-6-a]. Update the folder after every rate case order and every June benchmark reset [dte-rate-book]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies to the utility account manager before paying disputed invoices [consumers-large-business-rates]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites so board reporting reflects operational reality rather than blended averages [mpsc-choice-2025-report]. Legal should keep meter assignment language in leases aligned with the license holder entity on the utility account [noaa-cag-michigan].

Use cap data page for official U-15801 procedures [mpsc-cap-data].

Compliance and documentation practices

Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports, queue confirmation letters where applicable, CRES contracts, and witness test reports [eia-epm-5-6-a]. Update the folder after every rate case order and every June benchmark reset [dte-rate-book]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies to the utility account manager before paying disputed invoices [consumers-large-business-rates]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites [mpsc-choice-2025-report]. Legal should keep meter assignment language in leases aligned with the license holder entity on the utility account [noaa-cag-michigan].

Quarterly review cadence

Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports, queue confirmation letters where applicable, CRES contracts, and witness test reports [eia-epm-5-6-a]. Update the folder after every rate case order and every June benchmark reset [dte-rate-book]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies to the utility account manager before paying disputed invoices [consumers-large-business-rates]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites [mpsc-choice-2025-report]. Legal should keep meter assignment language in leases aligned with the license holder entity on the utility account [noaa-cag-michigan].

Related reading

Frequently asked questions

Is 16.63 cents per kWh what my Michigan facility will pay?

No. It is the EIA statewide average revenue per kWh across all commercial customers in June 2026. A dispensary on DTE D3 may land near it on full service. A grow on D4 with high billing demand can exceed it significantly on delivery charges alone.

Why is Michigan commercial power above the U.S. average?

Michigan's regulated full-service tariffs include heavy demand-based delivery charges at DTE and Consumers, and the 10 percent choice cap limits competitive supply pressure for new accounts. Industrial averages run 7.39 cents lower because larger accounts spread fixed demand charges over more kWh.

What is the DTE D4 vs D11 spread?

D4 bills 27.10 dollars/kW distribution demand on full service. D11 at primary voltage under 24 kV bills 7.15 dollars/kW. On 400 kW that is roughly 10,840 dollars vs 2,860 dollars per month on the distribution demand line alone.

Can I avoid demand charges on a small facility?

DTE Rate D3 has no demand charge up to 1,000 kW at company option. Consumers Rate GS is energy-based. Dispensaries and small labs that peak under thresholds stay on energy-only service.

Does the choice cap affect the rate I pay?

Yes. Most cannabis facilities are on utility full service because the cap is full. You pay the regulated tariff for your rate schedule, not a competitive AES price, until an allotment opens.

How does MISO capacity show up on the bill?

DTE bills a capacity demand charge of 9.18 dollars/kW on D4 full service plus non-capacity demand at 7.48 dollars/kW. Choice customers arrange their own capacity or take utility capacity service. MISO Zone 7 seasonal capacity auctions affect both paths.

About the author
Jaken Energy

Jason Taken founded Jaken Energy, the commercial energy procurement practice behind this site. He works with licensed cannabis operators in deregulated electricity markets to lower supply rates, manage demand charges, and evaluate efficiency upgrades.

Sources

Inline citations in this article, such as [eia-epm-5-6-a], refer to the entries below. Links open the primary source in a new tab.

  1. [eia-epm-5-6-a]Electric Power Monthly, Table 5.6.A: Average Price of Electricity to Ultimate Customers by End-Use Sector, by State, June 2026 and June 2025U.S. Energy Information Administration. Accessed 2026-09-11.
  2. [dte-rate-book]DTE Electric Company Rate Book for Electric Service, M.P.S.C. No. 1 - Electric (rate schedules D3, D4, D11)DTE Electric. Accessed 2026-09-11.
  3. [consumers-large-business-rates]High Energy Use Plans (GP, GPD, GPTU, EIP, LED, GSG-2, GI)Consumers Energy. Accessed 2026-09-11.
  4. [mpsc-choice-2025-report]State's electric choice program remains fully subscribed in 2025 (annual Status of Electric Competition report), February 2, 2026Michigan Public Service Commission. Accessed 2026-09-11.
  5. [noaa-cag-michigan]Climate at a Glance: Michigan statewide heating and cooling degree days, 1991-2020 base period averagesNOAA National Centers for Environmental Information. Accessed 2026-09-11.
  6. [oh-energychoice-glossary]Energy Choice Ohio: Glossary of Terms and Apples to Apples comparison chartsPublic Utilities Commission of Ohio. Accessed 2026-09-11.
  7. [dte-electric-choice]Electric Choice for Business (Cap Tracking System and Retail Access Service Rider terms)DTE Energy. Accessed 2026-09-11.
  8. [consumers-electric-choice]Electric Customer Choice for Business (ROA 10% Cap Tracking System report)Consumers Energy. Accessed 2026-09-11.
  9. [mpsc-cap-data]Electric Choice 10% Cap Data (PA 286 of 2008, Case No. U-15801)Michigan Public Service Commission. Accessed 2026-09-11.