Ohio Cannabis Extraction and Processing Facility Energy: Chillers, Ovens, and Flat Loads in PJM

An Ohio extraction lab runs a different load shape than a grow. Batch chillers, vacuum ovens, and solvent-recovery skids create short spikes rather than a flat 18-hour lighting block, but C1D1 ventilation runs continuously and keeps baseline demand high. With 46 dual-use processor licenses statewide and full CRES choice on all four IOUs, the savings lever is usually a supply contract priced for a flatter load factor, not demand ratchet management alone.

By Jason Taken, Founder, Jaken Energy

Updated September 11, 2026Last verified: September 11, 2026
Avg. commercial price
13.77 cents/kWh
June 2026
U.S. average
14.19 cents/kWh
June 2026
Energy choice
Electric choice under the Ohio Electric Restructuring Act of 1999 (Senate Bill 3), with CRES suppliers and the PUCO Apples to Apples comparison chart
All residential, commercial, and industrial customers of the four investor-owned utilities. Municipal electric systems and rural electric cooperatives are not open to CRES suppliers. Customers on the Percentage of Income Payment Plan (PIPP PLUS) cannot switch.
Cooling / heating degree days
792 / 5689
Annual normals; see climate source

Ohio figures last verified 2026-09-11. Full citations in the Sources section.

How a processor load differs from a grow

A cultivation facility presents a utility with a predictable block: lights on for 12 or 18 hours, HVAC and dehumidification layered on top, and a summer peak that often exceeds winter demand. An extraction lab is messier. Batch equipment creates spikes when chillers, vacuum ovens, and solvent-recovery units start together. C1D1 ventilation runs continuously and sets a baseline kW that never turns off during production hours. The monthly peak might come from a single batch start sequence rather than from lighting.

Ohio holds 46 dual-use processor licenses as of February 18, 2026 under the program restructured by S.B. 56 [oh-lsc-sb56-final-analysis]. Many processors sit in industrial parks served by AEP Ohio or FirstEnergy in central and northern Ohio, with a smaller cluster near Cincinnati on Duke Energy Ohio and Dayton on AES Ohio. All four territories are in PJM with full CRES choice [oh-energychoice-glossary].

Major load components

See extraction facility energy loads for equipment-level detail. In Ohio's climate the dominant lines are:

LoadBehaviorBilling impact
C1D1 exhaust and make-up airContinuous during productionSets baseline kW; winter heating on make-up air drives kWh
Recirculating chillersCyclical, high starting currentSpike risk if aligned with other equipment
Vacuum ovensBatch, moderate kWAdds to peak if ovens start with chillers
Solvent recoveryContinuous moderate loadFlattens load factor between batches
Lab HVACContinuousModerate kW, year-round

Ohio's 5,689 heating degree days mean make-up air heating is a real winter cost [noaa-cag-ohio]. Summer cooling degree days are only 792, so chiller sensible load is moderate, but humid summers still add latent work on ventilation [noaa-cag-ohio].

Rate class placement

Non-residential service at AEP Ohio runs GS-1 through GS-4 by size and voltage [aep-ohio-rates]. FirstEnergy uses GS, GP, GSU, and GT [fe-toledo-edison-tariff]. A standalone extraction facility with 150 to 300 kW of connected load typically lands on demand-metered secondary service.

Assume a processor near Columbus with 180 kW peak demand (continuous ventilation plus one chiller and two ovens starting together) and 95,000 kWh monthly use. At Ohio's June 2026 commercial average of 13.77 cents/kWh [eia-epm-5-6-a], energy alone is about $13,100 per month. Add per-kW distribution demand on GS-2 (confirm current $/kW on the AEP Ohio tariff) and the delivery side adds several thousand more.

Because extraction loads tend to run flatter than grows once ventilation baseline is established, supply pricing often favors the operator. A CRES supplier can price a fixed contract against a 0.55 to 0.65 load factor rather than the 0.75+ common in cultivation. Compare offers against the SSO Price to Compare, reset every June 1 [oh-energychoice-glossary].

Scheduling process loads around peaks

You cannot turn off C1D1 fans, but you can sequence batch equipment:

  1. Start chillers before ovens if the chiller has the longer ramp time.
  2. Avoid running solvent-recovery heat and vacuum oven heat in the same 15-minute interval.
  3. If the facility has multiple meters or subpanels, consider whether shared service keeps everything on one billing demand.

Interval data from the utility helps identify which batch sequence set the last three months' peaks. See interval data and AMI meters.

Supply contract choices for processors

PJM capacity and NITS pass-throughs were sharply higher in the 2026/27 delivery year [oh-energychoice-glossary]. For a processor with moderate peak but high run hours, a block-and-index contract that covers baseline kWh at a fixed price and lets batch spikes float on index may cost less than a fully fixed contract priced for worst-case demand.

Read early termination and auto-renewal language before signing. Ohio allows early termination fees on CRES contracts [oh-energychoice-glossary].

Power factor and motor loads

Chillers, compressors, and large exhaust fans can pull reactive power. If your bill shows a power factor adjustment, address it during buildout with capacitors or VFDs rather than paying the penalty for years. See power factor penalties.

Co-located processor and cultivator meters

Some Ohio dual-use operators process on the same campus as cultivation. Shared service agreements can consolidate load under one demand meter, which helps load factor for CRES pricing but merges peak events from both operations. Model worst-case simultaneous peaks before choosing single vs dual service [aep-ohio-rates].

PJM pass-through on processor contracts

Processors with 24-hour ventilation baselines benefit from block-and-index products that fix baseline kWh and float spikes [oh-energychoice-glossary]. Confirm whether the CRES quote passes through PJM capacity at market or fixed adder. The 2026/27 delivery year capacity costs were elevated [oh-energychoice-glossary].

Testing lab load as a comparison

Testing laboratories licensed by the Division of Cannabis Control draw lower peaks than hydrocarbon extraction but still run HVAC and instrument loads continuously [oh-dcc-cultivators-processors]. Labs on the same industrial park transformer as a processor may share demand billing. Clarify meter ownership in lease exhibits.

Demand response limited value

Ohio ended mandatory efficiency portfolios in 2020 [aep-ohio-efficient-products]. Limited demand response exists for commercial customers but C1D1 ventilation limits curtailment depth. Processors should not count on DR revenue to offset demand charges the way data centers might in other markets. Focus on batch sequencing and CRES fixed-price supply instead [oh-energychoice-glossary].

C1D1 ventilation as the baseline load

Hydrocarbon and ethanol extraction labs run classified ventilation continuously [oh-lsc-sb56-final-analysis]. That baseline kW cannot be shed for demand response. Batch equipment (chillers, ovens, solvent recovery) stacks on top and sets the monthly peak when starts align in the same fifteen-minute interval [fe-toledo-edison-tariff]. Ohio processors numbering 46 dual-use licenses as of February 2026 sit on all four IOU territories [oh-lsc-sb56-final-analysis].

Winter make-up air in Ohio

Ohio's long heating season (5,689 HDD) means preheating make-up air for C1D1 rooms dominates winter kWh [noaa-cag-ohio]. Summer cooling is moderate at 792 CDD, but humid outdoor air still adds latent load in July and August [noaa-cag-ohio]. Schedule maintenance shutdowns in shoulder months when ventilation load is lower [noaa-cag-ohio].

CRES supply for batch-heavy load shapes

Processors with flat ventilation and spiky batch load may fit block-and-index supply products better than pure fixed price [oh-energychoice-glossary]. See the Ohio block-and-index case study and extraction facility energy loads. Compare PJM capacity pass-through treatment on each product type before signing [oh-energychoice-glossary].

Solvent recovery and overnight load

Solvent recovery skids often run overnight, flattening load factor but keeping kWh high [fe-toledo-edison-tariff]. Batch ovens timed to start after chiller ramp can reduce fifteen-minute peaks [fe-toledo-edison-tariff]. Ohio full CRES choice lets processors bid supply immediately unlike Michigan capped markets [oh-energychoice-glossary]. Compare energy broker vs direct supplier for multi-site RFPs [oh-energychoice-glossary].

NEC Article 500 and continuous ventilation

Classified areas require ventilation interlocks that prevent shedding baseline kW [fe-toledo-edison-tariff]. Maintenance windows should be scheduled in shoulder months when heating load on make-up air is lower [noaa-cag-ohio]. Processors numbering 46 statewide compete for industrial service in four IOU territories [oh-lsc-sb56-final-analysis].

Post-S.B. 56 processor licensing

Dual-use processor licenses consolidated under S.B. 56 may co-locate with cultivation at the same address [oh-lsc-sb56-final-analysis]. Combined meter load requires demand-metered service planning from day one [aep-ohio-rates]. Separate submeters for COGS even on one utility meter [fe-toledo-edison-tariff].

Batch load management in four IOU territories

Forty-six dual-use processor licenses split across AEP, FirstEnergy, Duke, and AES [oh-lsc-sb56-final-analysis]. C1D1 ventilation sets continuous baseline kW [fe-toledo-edison-tariff]. Chillers, ovens, and recovery skids create batch spikes [fe-toledo-edison-tariff]. Winter make-up air heating dominates kWh with 5,689 HDD [noaa-cag-ohio].

Ohio allows immediate CRES choice unlike Michigan [oh-energychoice-glossary]. Block-and-index products may fit batch shapes [oh-energychoice-glossary]. Co-located cultivation and processing merge peaks on one meter after S.B. 56 [oh-lsc-sb56-final-analysis].

File queue paperwork when construction loan closes, not at certificate of occupancy [mcl-460-10a].

Compliance and documentation practices

Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports, queue confirmation letters where applicable, CRES contracts, and witness test reports [eia-epm-5-6-a]. Update the folder after every rate case order and every June benchmark reset [oh-lsc-sb56-final-analysis]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies to the utility account manager before paying disputed invoices [oh-energychoice-glossary]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites so board reporting reflects operational reality rather than blended averages [aep-ohio-rates]. Legal should keep meter assignment language in leases aligned with the license holder entity on the utility account [fe-toledo-edison-tariff].

File queue paperwork when construction loan closes, not at certificate of occupancy [mcl-460-10a].

Compliance and documentation practices

Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports, queue confirmation letters where applicable, CRES contracts, and witness test reports [eia-epm-5-6-a]. Update the folder after every rate case order and every June benchmark reset [oh-lsc-sb56-final-analysis]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies to the utility account manager before paying disputed invoices [oh-energychoice-glossary]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites [aep-ohio-rates]. Legal should keep meter assignment language in leases aligned with the license holder entity on the utility account [fe-toledo-edison-tariff].

Related reading

Compare with other states

Frequently asked questions

Is an Ohio extraction lab usually demand-metered?

Most processor facilities with C1D1 ventilation, chillers, and multiple production lines peak above the small non-demand threshold and land on GS-2 or equivalent demand-metered schedules at their IOU. A small post-harvest lab in a shared building might stay on GS-1 if total meter demand stays low, but standalone extraction facilities typically pay per-kW delivery charges.

Does batch scheduling help with demand charges in Ohio?

Yes, if you can avoid starting the chiller, vacuum oven, and solvent-recovery skid in the same 15-minute window as ventilation upgrades. C1D1 exhaust fans run continuously and set a floor, but staggering batch starts can keep the monthly peak below the sum of nameplate equipment ratings.

Can an Ohio processor shop for electricity supply?

Yes. All commercial customers of Ohio's four investor-owned utilities may buy generation from a PUCO-certified CRES provider. The utility keeps delivering power. Processors with flatter load factors than grows often benefit from fixed or block-and-index contracts that price supply against a higher load factor.

How many processor licenses operate in Ohio?

As of February 18, 2026 the Division of Cannabis Control listed 46 dual-use processor licenses under the merged adult-use and medical program after S.B. 56. Check the Division's live licensee list for current operational counts.

Does Ohio's climate affect extraction HVAC costs?

Ohio's 5,689 heating degree days mean significant winter heating for make-up air in C1D1 rooms, while 792 cooling degree days keep summer chiller load moderate. Humid summers add dehumidification load on ventilation systems. The climate matters less for extraction than for cultivation, but make-up air heating is a real winter kWh line.

Should a processor worry about power factor penalties?

Labs with large motor loads from chillers and compressors can draw reactive power that triggers power factor charges on some IOU schedules. If your bill shows a power factor adjustment line, see power factor guidance and consider capacitors or VFDs during buildout.

About the author
Jaken Energy

Jason Taken founded Jaken Energy, the commercial energy procurement practice behind this site. He works with licensed cannabis operators in deregulated electricity markets to lower supply rates, manage demand charges, and evaluate efficiency upgrades.

Sources

Inline citations in this article, such as [eia-epm-5-6-a], refer to the entries below. Links open the primary source in a new tab.

  1. [eia-epm-5-6-a]Electric Power Monthly, Table 5.6.A: Average Price of Electricity to Ultimate Customers by End-Use Sector, by State, June 2026 and June 2025U.S. Energy Information Administration. Accessed 2026-09-11.
  2. [oh-lsc-sb56-final-analysis]S.B. 56, 136th General Assembly, Final Analysis (corrected version), April 2, 2026Ohio Legislative Service Commission, Office of Research and Drafting. Accessed 2026-09-11.
  3. [oh-energychoice-glossary]Energy Choice Ohio: Glossary of Terms and Apples to Apples comparison chartsPublic Utilities Commission of Ohio. Accessed 2026-09-11.
  4. [aep-ohio-rates]AEP Ohio Electric Rates and Tariffs (Ohio Power Company Tariff Book, September 2026)AEP Ohio. Accessed 2026-09-11.
  5. [fe-toledo-edison-tariff]The Toledo Edison Company, P.U.C.O. No. 8, Schedule of Rates for Electric Service (2025 edition)FirstEnergy. Accessed 2026-09-11.
  6. [noaa-cag-ohio]Climate at a Glance: Ohio statewide heating and cooling degree days, 1991-2020 base period averagesNOAA National Centers for Environmental Information. Accessed 2026-09-11.
  7. [oh-dcc-cultivators-processors]Division of Cannabis Control: Cultivators & ProcessorsOhio Department of Commerce. Accessed 2026-09-11.
  8. [aep-ohio-efficient-products]Efficient Products for BusinessAEP Ohio. Accessed 2026-09-11.
  9. [mcl-460-10a]MCL 460.10a: Retail open access; 10% limit and queueMichigan Legislature. Accessed 2026-09-11.