Connecticut Cannabis Extraction Energy: Process Loads, Flatter Profiles, and Eversource Rate Placement

A Connecticut extraction or product manufacturing facility draws batch-oriented process load: chillers, vacuum ovens, solvent recovery, and C1D1 ventilation that can stack into a sharp afternoon peak if every line runs at once. The state lists 13 processing credentials across product manufacturers, food and beverage manufacturers, and packagers. Most labs sit on Eversource Rate 30 or 35 under 200 kW, or Rate 56 and 58 non-manufacturer schedules above 350 kW with per-kVA demand. A flatter load profile than a grow still benefits from Standard Service supply choice below 500 kW.

By Jason Taken, Founder, Jaken Energy

Updated September 11, 2026Last verified: September 11, 2026
Avg. commercial price
19.62 cents/kWh
June 2026
U.S. average
14.19 cents/kWh
June 2026
Energy choice
Retail electric choice under Public Act 98-28, An Act Concerning Electric Restructuring
All residential, commercial and industrial customers of Eversource (Connecticut Light and Power) and United Illuminating. Standard Service applies to customers with monthly demand below 500 kW; Last Resort Service applies at 500 kW and above.
Cooling / heating degree days
607 / 5849
Annual normals; see climate source

Connecticut figures last verified 2026-09-11. Full citations in the Sources section.

Processing load vs cultivation load

Connecticut lists 13 processing credentials: product manufacturers, food and beverage manufacturers, and packagers [ct-credential-count]. Extraction and processing draw batch equipment rather than flat horticultural lighting. Typical loads include hydrocarbon or ethanol recovery chillers, vacuum ovens, rotary evaporators, winterization freezers, and C1D1-rated ventilation that must run whenever classified electrical equipment operates.

Batch scheduling matters more here than in a flower room. Two production lines plus HVAC restart during Eversource time-of-day peak hours (weekdays noon to 8 p.m., 1 to 9 p.m. in daylight time) can set a monthly demand peak that persists on the bill for twelve months on Rate 56 and 58 [eversource-ct-rates-2026].

Rate class placement

Facility size (assumed)Likely Eversource rateDemand structure
Small lab under 200 kW peakRate 30 or 35Per-kW distribution, ESI, transmission, CTA [eversource-ct-rates-2026]
Mid-size lab 350-999 kWRate 56 non-manufacturerPer-kVA distribution and transmission [eversource-ct-rates-2026]
Large campus 1,000 kW+Rate 58 non-manufacturerHigher customer charge tier, per-kVA demand [eversource-ct-rates-2026]

Manufacturer Rates 55 and 57 carry lower transmission demand than non-manufacturer 56 and 58 [eversource-ct-rates-2026]. Cannabis extraction is not automatically classified as manufacturing. Ask Eversource account management for the assigned SIC-based class before electrical design is frozen.

United Illuminating labs on the coast use GS, GST, and LPT schedules [ui-pricing]. Peak hours for GST and LPT are 10 a.m. to 6 p.m. weekdays [ui-pricing]. Read demand charges from the September 1, 2026 rate sheets linked from the UI pricing page [ui-pricing].

Supply choice and the 500 kW boundary

Below 500 kW monthly demand, default supply is Standard Service reset every January 1 and July 1 [energizect-rate-board-business]. Eversource Standard Service for July through December 2026 is 11.229 cents/kWh [energizect-rate-board-business]. At 500 kW and above, Last Resort Service applies with monthly pricing [energizect-rate-board-business].

A lab expanding from three to six hydrocarbon lines should model whether peak demand crosses 500 kW in the same month new equipment energizes. Signing a fixed supplier contract before that month avoids default Last Resort exposure.

Worked example for a Waterbury lab

Assume a 12,000 square foot extraction facility on Eversource Rate 35:

InputValue
Annual kWh680,000 (assumed)
Peak kW175 (assumed)
Average commercial rate, June 202619.62 cents/kWh [eia-epm-5-6-a]
Standard Service supply11.229 cents/kWh Jul-Dec 2026 [energizect-rate-board-business]

All-in at statewide average: 680,000 × $0.1962 = $133,416 per year (assumed) [eia-epm-5-6-a]

Supply on Standard Service: 680,000 × $0.11229 = $76,357 per year (assumed) [energizect-rate-board-business]

Peak demand charge illustration on Rate 35 (assume 175 kW above 2 kW threshold):

  • Distribution: 173 kW × $8.69/kW = $1,503 (assumed one month) [eversource-ct-rates-2026]
  • Transmission: 173 kW × $14.58/kW = $2,522 (assumed one month) [eversource-ct-rates-2026]

Staggering batch starts to keep peak under Rate 56 threshold (350 kW) avoids the kVA-based large-class jump [eversource-ct-rates-2026].

Power factor and motor load

Chillers and compressors can trigger power factor penalties on kVA-billed Rate 56 and 58 accounts [eversource-ct-rates-2026]. Correcting power factor at the service entrance is often cheaper than paying reactive demand charges month after month.

Efficiency programs

Energy Opportunities covers process chillers, premium motors, VFDs, and custom measures [energizect-energy-opportunities]. A utility energy expert prepares a project agreement before equipment is ordered [energizect-energy-opportunities]. Annual electricity reporting under Section 21a-421m should use the same interval data you collect for procurement [ct-reraca-chapter-420h].

Co-location with cultivation meters

Many Connecticut processors share a campus meter with adjacent cultivation [ct-credential-count]. Batch spikes from chillers stack on top of flat lighting load when both run during Eversource time-of-day peak hours [eversource-ct-rates-2026]. If processing needs a separate meter for licensing or fire code, enroll supply on both accounts before energization so neither defaults to unintended Standard Service or LRS tiers [energizect-rate-board-business].

Food and beverage manufacturer credentials

Nine of thirteen processing credentials are food and beverage manufacturers [ct-credential-count]. Kitchen and packaging lines add motor load and refrigeration that differ from hydrocarbon extraction peaks [ct-credential-count]. Energy Opportunities lists refrigeration and premium motors among eligible measures [energizect-energy-opportunities]. Schedule utility review before ordering process equipment [energizect-energy-opportunities].

Vacuum ovens and overnight batch windows

Vacuum ovens and chillers often run outside retail peak hours but still inside Eversource time-of-day peak on weekdays [eversource-ct-rates-2026]. Shifting non-critical batches to nights and weekends lowers TOU energy components even when monthly demand kW is unchanged [eversource-ct-rates-2026]. Document schedule changes when comparing year-over-year bills [eversource-ct-rates-2026].

Hydrocarbon vs ethanol load shapes

Hydrocarbon extraction runs recovery chillers in short intense bursts; ethanol facilities may run longer continuous chiller load [ct-credential-count]. Both patterns interact with Eversource weekday noon-to-eight peak windows [eversource-ct-rates-2026]. Schedule batch starts after peak hours when fire code allows [eversource-ct-rates-2026].

Product manufacturers and food and beverage processors share the processing credential count [ct-credential-count]. Packaging lines with conveyors add motor load that benefits from VFD rebates listed in Energy Opportunities [energizect-energy-opportunities].

PURA supplier licensing reminder

Only PURA-licensed suppliers may enroll CL&P accounts [ct-pura-choose-supplier]. Verify licensing on the supplier handbook list before sharing load data [ct-pura-supplier-handbook]. Consolidated billing is standard; AP should reconcile supplier line items monthly [ct-pura-choose-supplier].

Annual reporting linkage

Section 21a-421m electricity usage reports should reuse supplier RFP data exports [ct-reraca-chapter-420h]. One CSV per account reduces year-end reconciliation [ct-reraca-chapter-420h].

Hydrocarbon versus ethanol batch shapes

Hydrocarbon extraction runs recovery chillers in short intense bursts; ethanol facilities may run longer continuous chiller load [ct-credential-count]. Both patterns interact with Eversource weekday noon-to-eight peak windows [eversource-ct-rates-2026]. Schedule batch starts after peak hours when fire code allows [eversource-ct-rates-2026].

Co-location with cultivation meters

Many Connecticut processors share a campus meter with adjacent cultivation [ct-credential-count]. Batch spikes from chillers stack on top of flat lighting load when both run during Eversource time-of-day peak hours [eversource-ct-rates-2026]. If processing needs a separate meter for licensing or fire code, enroll supply on both accounts before energization [energizect-rate-board-business].

Food and beverage manufacturer load

Nine of thirteen processing credentials are food and beverage manufacturers [ct-credential-count]. Kitchen and packaging lines add motor load and refrigeration that differ from hydrocarbon extraction peaks [ct-credential-count]. Energy Opportunities lists refrigeration and premium motors among eligible measures [energizect-energy-opportunities].

PURA Docket 06-10-22 supplier rate filings

Suppliers file consolidated-billing rates monthly in PURA Docket 06-10-22 and publish on the EnergizeCT Rate Board [energizect-rate-board-business]. Use the board to sanity-check broker quotes, not as the only sourcing step [energizect-rate-board-business]. Processors at 500 kW and above default to Last Resort Service priced monthly [energizect-rate-board-business].

Winter make-up air in Connecticut

Connecticut's 5,849 heating degree days mean preheating make-up air for C1D1 rooms dominates winter kWh [noaa-cag-connecticut]. Summer cooling at 607 CDD is moderate but humid outdoor air adds latent load in July and August [noaa-cag-connecticut]. Schedule maintenance shutdowns in shoulder months when ventilation load is lower [noaa-cag-connecticut].

Additional procurement and tariff notes

Thirteen processing credentials span product manufacturers, food and beverage manufacturers, and one packager [ct-credential-count]. Kitchen lines add refrigeration eligible for Energy Opportunities [energizect-energy-opportunities].

Additional load and utility notes

PURA-licensed suppliers only may enroll CL&P accounts [ct-pura-choose-supplier]. Verify licensing on the supplier handbook before sharing interval data [ct-pura-supplier-handbook].

Additional load and utility notes

Co-located extraction should stagger motor starts to avoid setting campus peak during Eversource weekday peak windows [eversource-ct-rates-2026]. Document schedule changes when comparing year-over-year bills [eversource-ct-rates-2026].

Additional load and utility notes

See extraction facility energy loads for batch scheduling concepts [ct-credential-count].

CRES supply for batch-heavy processors

Processors with flat ventilation and spiky batch load may fit block-and-index supply better than pure fixed price [ct-pura-choose-supplier]. Compare ISO-NE capacity pass-through on each product type [energizect-rate-board-business]. Co-located cultivation and processing merge peaks on one meter unless fire code requires separation [ct-credential-count].

Batch scheduling and TOU energy

Eversource weekday time-of-day peak is noon to 8 p.m. [eversource-ct-rates-2026]. Vacuum ovens and recovery chillers started at 1 p.m. pay peak energy even if monthly kW is unchanged [eversource-ct-rates-2026]. Shifting non-critical batches to nights and weekends lowers TOU energy when rooms remain on flat lighting [eversource-ct-rates-2026]. Document interval shifts when comparing year-over-year bills [ct-pura-choose-supplier].

Supplemental tariff and procurement detail

Nine food and beverage manufacturing credentials add refrigeration and motor load distinct from hydrocarbon peaks [ct-credential-count]. Energy Opportunities covers premium motors and refrigeration with utility pre-approval [energizect-energy-opportunities]. Processors at 500 kW and above default to Last Resort Service priced monthly unless a PURA-licensed supplier contract is in place [energizect-rate-board-business]. Compare extraction facility energy loads when scheduling batch windows [ct-credential-count].

Co-located campus demand planning

When cultivation and extraction share a meter, batch spikes from chillers and vacuum ovens stack on flat lighting load during Eversource weekday peak hours [eversource-ct-rates-2026]. Fire code may require a separate processing meter; enroll PURA-licensed supply on both accounts before energization [ct-pura-choose-supplier]. Food and beverage manufacturing credentials add kitchen refrigeration eligible for Energy Opportunities [energizect-energy-opportunities] [ct-credential-count]. Processors crossing 500 kW monthly demand leave Standard Service for Last Resort Service priced monthly [energizect-rate-board-business].

Where to go next

Tariff detail is on Eversource Connecticut and United Illuminating. Cultivation-specific humidity load is on the cultivation page. Enrollment is in the switching guide.

Compare with other states

Frequently asked questions

Is extraction classified as manufacturing at Eversource?

Rates 55 and 57 are reserved for manufacturers. Cultivation and cannabis processing are typically classified as non-manufacturer unless Eversource assigns otherwise. Confirm in writing before assuming manufacturer rates.

How flat is an extraction load compared to a grow?

Batch chillers, ovens, and recovery skids run in cycles rather than 18-hour lighting blocks. Peak kW often comes from two lines plus HVAC starting together, not from constant canopy load.

Does C1D1 ventilation drive demand?

Yes. Explosion-proof exhaust and make-up air can add tens of kW that stack on top of process equipment during batch windows.

When should a lab sign a supplier contract?

Before crossing 500 kW monthly demand, which moves default supply from semiannual Standard Service to monthly Last Resort Service. Also before January or July Standard Service resets if you want to hedge the next six-month utility price.

Are there rebates for process chillers?

Energy Opportunities lists process chillers, VFDs, and premium motors among eligible measures in existing business facilities, with utility expert review before ordering equipment.

Must extraction facilities report electricity use?

Yes. C.G.S. Section 21a-421m requires annual electricity usage reporting for cannabis establishments.

About the author
Jaken Energy

Jason Taken founded Jaken Energy, the commercial energy procurement practice behind this site. He works with licensed cannabis operators in deregulated electricity markets to lower supply rates, manage demand charges, and evaluate efficiency upgrades.

Sources

Inline citations in this article, such as [eia-epm-5-6-a], refer to the entries below. Links open the primary source in a new tab.

  1. [eia-epm-5-6-a]Electric Power Monthly, Table 5.6.A: Average Price of Electricity to Ultimate Customers by End-Use Sector, by State, June 2026 and June 2025U.S. Energy Information Administration. Accessed 2026-09-11.
  2. [ct-credential-count]Cannabis Credential Count (open dataset, rows updated September 11, 2026)Connecticut Department of Consumer Protection via Connecticut Open Data. Accessed 2026-09-11.
  3. [eversource-ct-rates-2026]Summary of Connecticut Electric Rates, last updated May 1, 2026Eversource Energy (The Connecticut Light and Power Company). Accessed 2026-09-11.
  4. [energizect-rate-board-business]Rate Board: Business Generation Rates (Eversource and United Illuminating Standard Service 2024-2026 and supplier-billed rates under PURA Docket 06-10-22)EnergizeCT / Connecticut Public Utilities Regulatory Authority. Accessed 2026-09-11.
  5. [ct-reraca-chapter-420h]Connecticut General Statutes Chapter 420h: Responsible and Equitable Regulation of Adult-Use Cannabis (P.A. 21-1, June Special Session)Connecticut General Assembly. Accessed 2026-09-11.
  6. [energizect-energy-opportunities]Energy Opportunities for Business FacilitiesEnergizeCT (Eversource and United Illuminating). Accessed 2026-09-11.
  7. [ui-pricing]Pricing: UI Rates and Riders, Standard Service and Last Resort generation ratesThe United Illuminating Company. Accessed 2026-09-11.
  8. [ct-pura-choose-supplier]Choose a Supplier Information for CustomersConnecticut PURA. Accessed 2026-09-11.
  9. [ct-pura-supplier-handbook]Electric Supplier/Aggregator HandbookConnecticut PURA. Accessed 2026-09-11.