Delaware Cannabis Cultivation Facility Energy: Greenhouse and Indoor Loads on Delmarva Power
Delaware cultivation load is landing on Delmarva Power in New Castle County and the beaches, on the Delaware Electric Cooperative in rural Sussex and Kent, or on municipal systems in cities like Newark and Dover. Only Delmarva customers can shop PSC-certified suppliers. The state's 1,141 cooling degree days and humid coastal summers push sealed indoor rooms toward dehumidification-heavy peaks, while greenhouse operators on co-op territory face a different rate book entirely.
Delaware figures last verified 2026-09-11. Full citations in the Sources section.
Utility territory comes before canopy design
Delaware cannabis cultivation sites split three ways [de-psc-electric-choice]:
- Delmarva Power in Wilmington, New Castle County, eastern Kent and Sussex, and the beach towns. Full PSC retail choice. PJM.
- Delaware Electric Cooperative across rural Kent and Sussex farmland. No PSC supplier market.
- Municipal systems in Newark, Dover, Milford, and six other cities. No PSC choice; city-set rates.
The OMC lottery is placing new facilities now [de-news-adult-use-launch]. Confirm the utility at the address before signing a lease or buying land. A grow optimized for supplier choice on Delmarva saves nothing if the site sits on co-op wires.
What an indoor grow looks like on Delmarva
Delmarva non-residential schedules are SGS-ND (small general service, non-demand), MGS-S (medium general service, secondary, demand-billed), LGS-S (large general service, secondary), and GS-P (primary voltage) [de-psc-electric-choice]. MGS-S, LGS-S, and GS-P carry per-kW distribution demand charges.
Assume 6,000 square feet of flowering canopy under LEDs at 35 W/sq ft (an assumption). Lighting draws 210 kW on cycle. Add 40 kW veg, 150 kW summer HVAC and dehumidification peak, and 30 kW auxiliary load. Summer coincident peak is about 430 kW.
That peak lands on MGS-S or LGS-S with demand billing [de-psc-electric-choice]. Pull the current Delaware electric tariff for kW breakpoints and $/kW; Docket 25-1555 proposed increases on these classes [de-psc-rate-case-25-1555].
Humidity and the longest cooling season in the Mid-Atlantic
Delaware runs 4,483 heating degree days and 1,141 cooling degree days [noaa-cag-delaware]. Summer dew points in the low to mid 70s F are common statewide, and Sussex County stays humid into October [noaa-cag-delaware]. The dehumidification load page explains why latent cooling often sets peak demand.
Compared with Maryland at 1,140 CDD, Delaware's coastal plain extends the dehumidification season. Compared with New Jersey, Delaware's slightly higher CDD total means more months where HVAC, not lighting, drives the bill.
A worked annual cost on Delmarva
| Load | Assumption | Annual kWh |
|---|---|---|
| Flower lighting | 210 kW × 12 h × 365 d | 919,800 |
| Veg lighting | 40 kW × 18 h × 365 d | 262,800 |
| HVAC/dehumid (average) | 90 kW continuous average | 788,400 |
| Auxiliary | 30 kW continuous | 262,800 |
| Total | 2,233,800 |
At EIA's June 2026 Delaware commercial average of 14.40 cents/kWh, energy is about $321,700/year [eia-epm-5-6-a]. At the industrial average of 12.24 cents, about $273,400 [eia-epm-5-6-a].
Add delivery demand charges separately from the tariff. With a assumed 430 kW peak and demand-billed service, even a modest $/kW rate adds tens of thousands annually. See demand charges explained.
Default supply: SOS vs. Hourly Priced Service
Small and medium commercial accounts on fixed SOS receive full-requirements supply from PSC-supervised reverse auctions [de-psc-electric-choice]. Larger accounts default to Hourly Priced Service with PJM pass-through [de-psc-electric-choice]. A grow crossing the HPS threshold needs a supplier contract for budget stability. The switching guide covers enrollment.
Greenhouse and co-op considerations
Greenhouse cultivation is common on Sussex County farmland, often on Delaware Electric Cooperative service [de-psc-electric-choice]. Co-op members cannot shop PSC suppliers but may access Energize Delaware agricultural programs and Green Energy Program solar grants [energize-delaware] [de-green-energy-program].
Supplemental lighting in a greenhouse creates the same peak-demand issue on whichever rate book applies. Co-op commercial rates are set by the co-op board, not Delmarva's tariff.
Buildout checklist for lottery licensees
Most lottery winners are still converting conditional licenses [de-news-adult-use-launch]. Before energizing:
- Confirm Delmarva vs. co-op vs. municipal service
- Size service to expected peak, not aspirational canopy five years out
- Pre-apply for Delmarva Energy Savings for Business if on Delmarva [delmarva-esb]
- Request interval metering if peak will exceed medium general service thresholds
The Delaware rate page holds class definitions and EIA benchmarks.
Power factor and future load from lottery winners
Delmarva bills distribution demand on billed kW for MGS-S and LGS-S accounts [de-psc-electric-choice]. If the cooperative serves your site instead, ask whether the co-op uses kW or kVA billing before ordering LED drivers with poor power factor. On Delmarva, poor power factor can inflate apparent demand on some industrial schedules; confirm in the tariff for your voltage level.
Lottery-selected cultivators still in conditional status should model energization load against the license footprint, not against aspirational five-year expansion [de-news-adult-use-launch]. Oversized service creates a higher demand baseline before the first harvest. If buildout includes on-site solar, the Green Energy Program may offset capital cost for Delmarva, co-op, or municipal customers [de-green-energy-program]. Solar reduces kWh but rarely eliminates evening lighting peak; pair PV with realistic peak kW targets in supplier contracts.
Comparing supply products on Delmarva
Fixed SOS from reverse auctions sets the benchmark for small and medium accounts [de-psc-electric-choice]. Competitive suppliers offer fixed, index, and block-and-index products described on the fixed vs. index page. Cultivation load is flat enough that fixed supply often matches operations, but block-and-index can hedge a partial load if you plan to add rooms mid-contract. Always state whether PJM capacity is bundled; the PSC notes that supplier contracts pass through the customer's capacity obligation [de-psc-electric-choice].
When Docket 25-1555 final rates take effect, delivery will move independently of your supply price [de-psc-rate-case-25-1555]. Re-benchmark supplier savings after the rate case order, not before. Document the SOS rate on the bill each quarter if you stay on default supply so finance can compare against supplier bids without reconstructing history from memory.
Municipal Newark and Dover exceptions
Nine municipal electric systems serve Newark, Dover, Milford, and other cities outside PSC retail choice [de-psc-electric-choice]. A cultivation license in Newark budgets from the city tariff, not Delmarva SOS [de-psc-electric-choice]. Energize Delaware agricultural programs and the Green Energy Program still offer efficiency and solar options on co-op and municipal service [energize-delaware] [de-green-energy-program].
Interval review before supplier RFP
Request twelve months of interval data from Delmarva before soliciting supplier quotes on MGS-S or LGS-S [de-psc-electric-choice]. Summer peaks from dehumidification in 1,141 CDD climate set both delivery kW and PJM capacity tags passed through in supplier contracts [noaa-cag-delaware] [de-psc-electric-choice]. See peak demand vs peak usage.
Quarterly bill review cadence
Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports where available, supplier contracts, and witness test reports [eia-epm-5-6-a]. Update the folder after every rate case order and every benchmark reset published by the regulator [de-news-adult-use-launch]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies before paying disputed invoices [de-psc-electric-choice]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites [noaa-cag-delaware]. Legal should keep meter assignment language in leases aligned with the license holder on the utility account [energize-delaware]. Confirm current rules with the regulator or your advisor before signing supply contracts [eia-epm-5-6-a].
Documentation for audits and lenders
Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports where available, supplier contracts, and witness test reports [eia-epm-5-6-a]. Update the folder after every rate case order and every benchmark reset published by the regulator [de-news-adult-use-launch]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies before paying disputed invoices [de-psc-electric-choice]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites [noaa-cag-delaware]. Legal should keep meter assignment language in leases aligned with the license holder on the utility account [energize-delaware]. Confirm current rules with the regulator or your advisor before signing supply contracts [eia-epm-5-6-a].
Board reporting on utility COGS
Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports where available, supplier contracts, and witness test reports [eia-epm-5-6-a]. Update the folder after every rate case order and every benchmark reset published by the regulator [de-news-adult-use-launch]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies before paying disputed invoices [de-psc-electric-choice]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites [noaa-cag-delaware]. Legal should keep meter assignment language in leases aligned with the license holder on the utility account [energize-delaware]. Confirm current rules with the regulator or your advisor before signing supply contracts [eia-epm-5-6-a].
Tariff verification before budgeting
Maintain a utility folder with the current tariff PDF, last twelve months of bills, interval exports where available, supplier contracts, and witness test reports [eia-epm-5-6-a]. Update the folder after every rate case order and every benchmark reset published by the regulator [de-news-adult-use-launch]. Facility managers should reconcile billing demand to interval peaks monthly and escalate discrepancies before paying disputed invoices [de-psc-electric-choice]. Corporate finance should map utility COGS to cultivation, processing, or retail cost centers consistently across sites [noaa-cag-delaware]. Legal should keep meter assignment language in leases aligned with the license holder on the utility account [energize-delaware]. Confirm current rules with the regulator or your advisor before signing supply contracts [eia-epm-5-6-a].
Witness test and service letter timing
Submit expected peak kW and one-line diagrams during Delmarva's service application, not after equipment arrives [de-psc-electric-choice]. Oversized transformers raise monthly customer charges even when canopy is partial [de-psc-rate-case-25-1555].
Compare with other states
Frequently asked questions
Can a Delaware grow on the Electric Cooperative shop for supply?
No. Delaware Electric Cooperative is outside the PSC retail choice program. Members buy power through the co-op's wholesale arrangements. Energize Delaware and the Green Energy Program still offer some efficiency and solar options for co-op territory.
What Delmarva schedule does a mid-sized indoor grow use?
Delmarva's non-residential schedules are SGS-ND for small non-demand service, MGS-S for medium general service with demand billing, and LGS-S for large general service. Cultivation facilities with several thousand square feet of canopy commonly land on MGS-S or LGS-S with per-kW distribution demand charges.
How does Delaware humidity compare to other Mid-Atlantic grow states?
Delaware averages 1,141 cooling degree days, the highest among Mid-Atlantic choice states on this site, with summer dew points in the low to mid 70s F. Latent load runs longer into the fall on Sussex County's coastal plain than inland.
When is new Delaware cultivation load coming online?
Adult-use sales began August 1, 2025 through converted medical centers, but most of the 125 lottery-selected licensees are still converting conditional licenses to active status. New cultivation load is energizing in 2026 and 2027.
Are Delmarva delivery rates stable?
Not currently. PSC Docket 25-1555 proposed an average 21.7 percent base-rate increase with larger increases on MGS-S, LGS-S, and GS-P commercial classes. Confirm the outcome before budgeting delivery.
Are there agricultural energy programs for Delaware greenhouses?
Energize Delaware offers Solar Energy for Agriculture and commercial programs that include greenhouse operations. Delmarva's Energy Savings for Business covers HVAC and lighting for qualifying Delmarva accounts.
Related reading
- Delaware Cannabis Energy: Electricity Choice, Rates, and Delmarva Power for Licensed Operators
Delaware cannabis power guide: Delmarva retail choice, co-op and municipal exceptions, adult-use launch, and commercial rates near the U.S. average.
- Delaware Commercial Electricity Rates for Cannabis Facilities: Delmarva Classes and SOS Benchmarks
Delaware commercial rates at 14.40 cents/kWh vs. the U.S. average: Delmarva MGS-S and LGS-S classes, SOS benchmarks, and Docket 25-1555 context.
- How to Switch Electricity Suppliers in Delaware: A Step-by-Step Guide for Cannabis Businesses
How a Delmarva Power Delaware account enrolls with a PSC-certified supplier: SOS benchmark, three-day switch, rescission rules, and billing options.
- Maryland Cannabis Cultivation Facility Energy: Lighting, Dehumidification, and BGE Demand Classes
What a Maryland indoor grow pays for power: lighting and latent cooling in a 1,140 CDD climate, BGE and Pepco demand schedules, and a worked cost example.
- New Jersey Cannabis Cultivation Energy: Humid Climate, PJM Capacity, and BGS-CIEP Exposure
NJ indoor grow power: 5,168 HDD and 859 CDD, PSE&G LPL vs BGS-CIEP, dehumidification loads, and a worked cost example at 18.47 cents/kWh.
- Demand Charges Explained for Cannabis Cultivators
What a demand charge is, how utilities measure peak kW in 15- or 30-minute windows, why grow rooms get hit hard, how ratchets work, and a worked example.
- Dehumidification Load in Indoor Cannabis Cultivation
How much water a flowering canopy puts into the air, latent vs sensible load, dehumidifier pints-per-kWh ratings, and how it shows up on the electric bill.
- LED vs. HPS Grow Lighting: Energy Cost Comparison
Cited efficacy for double-ended HPS and DLC-listed LEDs, the heat-load difference, a worked cost comparison per 1,000 sq ft, and how rebates change payback.
- HVAC Sizing for Cannabis Grow Rooms
How to turn lighting watts into cooling tons, why latent load is half the problem in a flower room, what oversizing costs, and how HVAC drives demand charges.
Jason Taken founded Jaken Energy, the commercial energy procurement practice behind this site. He works with licensed cannabis operators in deregulated electricity markets to lower supply rates, manage demand charges, and evaluate efficiency upgrades.
Sources
Inline citations in this article, such as [eia-epm-5-6-a], refer to the entries below. Links open the primary source in a new tab.
- [eia-epm-5-6-a]Electric Power Monthly, Table 5.6.A: Average Price of Electricity to Ultimate Customers by End-Use Sector, by State, June 2026 and June 2025 — U.S. Energy Information Administration. Accessed 2026-09-11.
- [de-news-adult-use-launch]Delaware Launches Legal Adult-Use Cannabis Sales Today (August 1, 2025) — State of Delaware News / Office of the Marijuana Commissioner. Accessed 2026-09-11.
- [de-psc-electric-choice]Customer Electric Choice — Delaware Public Service Commission. Accessed 2026-09-11.
- [noaa-cag-delaware]Climate at a Glance: Delaware statewide heating and cooling degree days, 1991-2020 base period averages — NOAA National Centers for Environmental Information. Accessed 2026-09-11.
- [energize-delaware]Energize Delaware (Delaware Sustainable Energy Utility) — Delaware Sustainable Energy Utility. Accessed 2026-09-11.
- [delmarva-esb]Energy Savings for Business — Delmarva Power. Accessed 2026-09-11.
- [de-psc-rate-case-25-1555]PSC Docket No. 25-1555: Delmarva Power Electric Rate Case Opening Order and Public Notice — Delaware Public Service Commission. Accessed 2026-09-11.
- [de-green-energy-program]Green Energy Program — Delaware Department of Natural Resources and Environmental Control. Accessed 2026-09-11.